logo
Site map        
Find
News

Sigma 7
 
Home / News / -144 31

Our specialists reported on work on Tu-144 on the 31st of July

2019-07-31 15:15:26

Our specialists reported on work on Tu-144 on the 31st of July

Working day started with the preparation of tools for the work with gun grease - some of them were dirtied with unacceptable lubricating oil, some of them just needed some cleaning.
Then we started further corrosion proofing of the rake of the left joint of wing panel and fuselage. The work consisted of draining the rake with the wiper and heat gun and further filling of dry and hot hollows with hot gun grease.
The process was often interposed because of bad weather. We managed to fill the left rake with gun grease towards evening.
During the rain pauses we did some checking of working capacity of bleed holes in nacelles and issuing spotting, which needed water-proofing or additional bleed hole. 

 

Home
MAKS 2019
Aboutus
Services
Ourprojects
Job vacancies
Contacts
share facebook vk twitter  
© LLC NIK 2017. Tel/fax: + 7 (495) 78 313 78. E-mail: