Work on u-144. Report for the 1st of August

2019-08-01 15:13:56

Work on u-144. Report for the 1st of August

We spent the whole day with the fuselage joint and the right panel of the wing. We filled the rake with gun grease. In included dewatering, heat gun drying, filling the hollows with lubricating oil.
As a result the whole right joint was filled.

 