logo
Site map        
Find
News

Sigma 7
 
Home / News / -144 2-4

Report about work on Tu-144 for the 2nd-4th of August

2019-08-04 16:21:47

Report about work on Tu-144 for the 2nd-4th  of August

On Friday and in the weekend we did the full dewatering of the rake. We filled the askew wells of the joint with gun grease.
We finished works on cleaning the upper protection panels from blotting and old jointing compound. We took an active part in installation of the panels – de-oiling of mounting surface, coating with jointing compound, panel installation, rubbing out the junctures.
As a result we fully closed the right upper, the left lower and upper rakes.

 

 

Home
MAKS 2019
Aboutus
Services
Ourprojects
Job vacancies
Contacts
share facebook vk twitter  
© LLC NIK 2017. Tel/fax: + 7 (495) 78 313 78. E-mail: